A flat or cross-hole needs a defined location and orientation as well as size. Define hole size, position, orientation, intersection, then connect those inputs to the feature-to-inspection map. That gives the engineering and purchasing teams a common basis for the next step. The practical tool in this guide is a feature location diagram connected to the required project handover.
For an OEM team, position tolerance becomes useful when Flat and cross-hole, Locate flats and, Identify the feature, and Explain the combined are tied to one component or purchase decision. This guide follows the seven stages in the source framework and keeps manufacturing, inspection and delivery assumptions visible as the project moves forward.
The position tolerance examples are planning methods, not universal acceptance values. Apply them to the released bicycle platform, mating parts and approved validation plan, and keep any open field identified until the responsible team closes it.
Flat and cross-hole position control: the decision to resolve
Start with the current part, assembly or order state rather than a blank specification. For position tolerance, this means the team should flat and cross-hole position control: the decision to resolve with Flat and cross-hole visible in the discussion. The purpose is to connect the article topic to an actual bicycle component, hardware family or purchase order rather than treat the heading as a general capability claim.
Place Flat and cross-hole, Locate flats and, Identify the feature, and Explain the combined in the same working record. A change to one field can alter machining access, final fit, inspection effort, batch planning or the delivered condition. The immediate output is a flat and cross-hole position control: the decision to resolve record that states the current revision, the proposed change and the point that still needs approval.
The first record should show what is known, what is assumed and which decision the project team needs next. In a practical position tolerance review, engineering should explain the functional reason, purchasing should confirm quantity and supplied scope, and manufacturing should identify the route or information needed to proceed. The team can then compare alternatives without mixing an unapproved proposal into the released requirement.
For a prototype or first order, write one or two questions that the part, report or delivery can answer. Keep the result with the relevant drawing, material and finish state. If geometry, quantity, processing or assembly changes later, reopen the stage 1 working record for the affected configuration rather than extending the earlier conclusion without review.
Locate flats and cross-holes from functional datums
Translate the requirement into feature-level inputs that design, purchasing and manufacturing can all read. For position tolerance, this means the team should locate flats and cross-holes from functional datums with Locate flats and visible in the discussion. The purpose is to connect the article topic to an actual bicycle component, hardware family or purchase order rather than treat the heading as a general capability claim.
Place Identify the feature,, Explain the combined, Design support and and Define edge condition in the same working record. A change to one field can alter machining access, final fit, inspection effort, batch planning or the delivered condition. The immediate output is a locate flats and cross-holes from functional datums record that states the current revision, the proposed change and the point that still needs approval.
This is where an attractive concept becomes a controlled drawing, process question or supply definition. In a practical position tolerance review, engineering should explain the functional reason, purchasing should confirm quantity and supplied scope, and manufacturing should identify the route or information needed to proceed. The team can then compare alternatives without mixing an unapproved proposal into the released requirement.
For a prototype or first order, write one or two questions that the part, report or delivery can answer. Keep the result with the relevant drawing, material and finish state. If geometry, quantity, processing or assembly changes later, reopen the stage 2 working record for the affected configuration rather than extending the earlier conclusion without review.
| Stage | Project decision | Inputs to connect | Working output |
|---|---|---|---|
| 01 | Flat and cross-hole position control: the decision to resolve | Flat and cross-hole / Locate flats and / Identify the feature, | flat and cross-hole position control: the decision to resolve record |
| 02 | Locate flats and cross-holes from functional datums | Identify the feature, / Explain the combined / Design support and | locate flats and cross-holes from functional datums record |
| 03 | Identify the feature, datum and acceptance state | Design support and / Define edge condition / Drawing revision | identify the feature, datum and acceptance state record |
| 04 | Explain the combined turning and milling route | Drawing revision / Assembly interface / Material state | explain the combined turning and milling route record |
| 05 | Design support and clamping around functional surfaces | Material state / Finish state / Order quantity | design support and clamping around functional surfaces record |
| 06 | Define edge condition without changing the functional geometry | Order quantity / Inspection method / Delivery scope | define edge condition without changing the functional geometry record |
| 07 | Put the discussion into a project request | Delivery scope / Flat and cross-hole / Locate flats and | put the discussion into a project request record |

Identify the feature, datum and acceptance state
Connect the selected option to the machining route and the interfaces that the finished part must serve. For position tolerance, this means the team should identify the feature, datum and acceptance state with Identify the feature, visible in the discussion. The purpose is to connect the article topic to an actual bicycle component, hardware family or purchase order rather than treat the heading as a general capability claim.
Place Design support and, Define edge condition, Drawing revision and Assembly interface in the same working record. A change to one field can alter machining access, final fit, inspection effort, batch planning or the delivered condition. The immediate output is a identify the feature, datum and acceptance state record that states the current revision, the proposed change and the point that still needs approval.
A sample should answer a named question instead of acting as a general promise about future production. In a practical position tolerance review, engineering should explain the functional reason, purchasing should confirm quantity and supplied scope, and manufacturing should identify the route or information needed to proceed. The team can then compare alternatives without mixing an unapproved proposal into the released requirement.
For a prototype or first order, write one or two questions that the part, report or delivery can answer. Keep the result with the relevant drawing, material and finish state. If geometry, quantity, processing or assembly changes later, reopen the stage 3 working record for the affected configuration rather than extending the earlier conclusion without review.
Explain the combined turning and milling route
Define how the result will be checked and which revision or lot the record belongs to. For position tolerance, this means the team should explain the combined turning and milling route with Explain the combined visible in the discussion. The purpose is to connect the article topic to an actual bicycle component, hardware family or purchase order rather than treat the heading as a general capability claim.
Place Drawing revision, Assembly interface, Material state and Finish state in the same working record. A change to one field can alter machining access, final fit, inspection effort, batch planning or the delivered condition. The immediate output is a explain the combined turning and milling route record that states the current revision, the proposed change and the point that still needs approval.
The measurement or review method must evaluate the relationship described by the drawing and assembly. In a practical position tolerance review, engineering should explain the functional reason, purchasing should confirm quantity and supplied scope, and manufacturing should identify the route or information needed to proceed. The team can then compare alternatives without mixing an unapproved proposal into the released requirement.
For a prototype or first order, write one or two questions that the part, report or delivery can answer. Keep the result with the relevant drawing, material and finish state. If geometry, quantity, processing or assembly changes later, reopen the stage 4 working record for the affected configuration rather than extending the earlier conclusion without review.
Design support and clamping around functional surfaces
Carry the engineering decision into batch, assembly, service or delivery planning. For position tolerance, this means the team should design support and clamping around functional surfaces with Design support and visible in the discussion. The purpose is to connect the article topic to an actual bicycle component, hardware family or purchase order rather than treat the heading as a general capability claim.
Place Material state, Finish state, Order quantity and Inspection method in the same working record. A change to one field can alter machining access, final fit, inspection effort, batch planning or the delivered condition. The immediate output is a design support and clamping around functional surfaces record that states the current revision, the proposed change and the point that still needs approval.
This prevents a technically sound decision from being lost when quantities, operators or suppliers change. In a practical position tolerance review, engineering should explain the functional reason, purchasing should confirm quantity and supplied scope, and manufacturing should identify the route or information needed to proceed. The team can then compare alternatives without mixing an unapproved proposal into the released requirement.
For a prototype or first order, write one or two questions that the part, report or delivery can answer. Keep the result with the relevant drawing, material and finish state. If geometry, quantity, processing or assembly changes later, reopen the stage 5 working record for the affected configuration rather than extending the earlier conclusion without review.

Define edge condition without changing the functional geometry
Close the topic with a release-ready project package and one responsible owner for each open point. For position tolerance, this means the team should define edge condition without changing the functional geometry with Define edge condition visible in the discussion. The purpose is to connect the article topic to an actual bicycle component, hardware family or purchase order rather than treat the heading as a general capability claim.
Place Order quantity, Inspection method, Delivery scope and Flat and cross-hole in the same working record. A change to one field can alter machining access, final fit, inspection effort, batch planning or the delivered condition. The immediate output is a define edge condition without changing the functional geometry record that states the current revision, the proposed change and the point that still needs approval.
The supplier can then quote or plan work against a visible scope while the OEM retains approval of the final application. In a practical position tolerance review, engineering should explain the functional reason, purchasing should confirm quantity and supplied scope, and manufacturing should identify the route or information needed to proceed. The team can then compare alternatives without mixing an unapproved proposal into the released requirement.
For a prototype or first order, write one or two questions that the part, report or delivery can answer. Keep the result with the relevant drawing, material and finish state. If geometry, quantity, processing or assembly changes later, reopen the stage 6 working record for the affected configuration rather than extending the earlier conclusion without review.
Put the discussion into a project request
Turn the completed review into a concise project request that names the supplied information and the next decision. For position tolerance, this means the team should put the discussion into a project request with Flat and cross-hole visible in the discussion. The purpose is to connect the article topic to an actual bicycle component, hardware family or purchase order rather than treat the heading as a general capability claim.
Place Delivery scope, Flat and cross-hole, Locate flats and and Identify the feature, in the same working record. A change to one field can alter machining access, final fit, inspection effort, batch planning or the delivered condition. The immediate output is a put the discussion into a project request record that states the current revision, the proposed change and the point that still needs approval.
This final handover keeps the article useful without turning each earlier section into a sales claim. In a practical position tolerance review, engineering should explain the functional reason, purchasing should confirm quantity and supplied scope, and manufacturing should identify the route or information needed to proceed. The team can then compare alternatives without mixing an unapproved proposal into the released requirement.
For a prototype or first order, write one or two questions that the part, report or delivery can answer. Keep the result with the relevant drawing, material and finish state. If geometry, quantity, processing or assembly changes later, reopen the stage 7 working record for the affected configuration rather than extending the earlier conclusion without review.
Questions buyers ask
What is the practical starting point for flat and cross-hole position control?
A flat or cross-hole needs a defined location and orientation as well as size. Define hole size, position, orientation, intersection, then connect those inputs to the feature-to-inspection map. That gives the engineering and purchasing teams a common basis for the next step.
Why is a cross-hole diameter not the whole requirement?
The hole may also need a position and orientation relative to a shaft, shoulder or drive feature. Identify the mating function and the datums used to locate it. Include the intersection and edge condition in the discussion, because an accurately sized hole can still be unsuitable when its location or internal edge is uncontrolled.
What makes a precision requirement inspectable?
The requirement should identify the controlled feature, its permitted variation and any datum relationship, together with the condition in which it is accepted. State the drawing convention and use a measurement method suited to the feature. A small tolerance number without those connections can leave two teams checking different things.
Does one setup remove every source of geometric error?
No. Keeping features in one setup can reduce transfers between operations, but machine behavior, workholding, tools and measurement still matter. Describe which features are created together and which operations remain separate. Compare the finished requirement and production economics rather than treating the machine configuration as proof of part conformity.
What should a workholding proposal explain?
Identify where the workpiece is located, supported and clamped, and which surfaces must remain protected or accessible. Explain transfers between operations and the relationship to the drawing datums. For repeat orders, record the fixture identity and setup instructions so that a familiar part does not depend on an undocumented individual adjustment.
Turn the Position Tolerance Question into a Controlled RFQ
Discuss flat and cross-hole position control with PremFixer Fasteners. Send your available drawing, BOM or part information, project stage and quantities so the scope and next step can be defined.
Discuss the RFQ